What it looks like after handover
Twelve deployments written by the engineers who commissioned them — and the numbers the customer measured six months after handover.
-
Commissioning a fleet without a commissioning engineer
Every unit ships pre-flashed and self-checking, so the site team does the first power-on without us in the room.
-
Peak season packed by two people and a conveyor
Twelve thousand parcels a day out of a back room that used to hold four packing benches.
-
One platform, thirty university labs
Identical hardware at every site so results stay comparable between papers.
-
The furnace hall nobody wanted to walk at 3am
A fixed patrol that reads gauge clusters and thermal drift while the plant is empty.