Cases12 deployments

What it looks like after handover

Twelve deployments written by the engineers who commissioned them — and the numbers the customer measured six months after handover.

Total 12 case studies

Page 1 of 2
  1. Night picking stopped being the bottleneck

    Twelve AMRs retrofitted around existing racking, with zero days of downtime during the changeover.

    2026
  2. Fourteen substations inspected, no outage booked

    A LiDAR payload that maps live switchgear from outside the exclusion zone, flown between scheduled maintenance windows.

    2025
  3. Variable-rate spraying across 4,000 hectares

    Application maps built from multispectral flights the week before, so the sprayer never crosses a healthy row.

    2025
  4. Small-batch yield up 23% on a line built for long runs

    Arm, gripper and vision package bolted onto an existing cell in three weekends.

    2025
  5. Ninety nights of perimeter patrol, zero false alarms

    Thermal and LiDAR fused on site for two weeks before the fleet was allowed to run unattended.

    2025
  6. A 120-seat robotics lab, handed over in six weeks

    Three campuses, one curriculum, and a spare-parts kit sized for a full academic year of student mistakes.

    2024
  7. Micron metrology moved out of the clean room

    An optical cell that holds its calibration on a shop floor with a 4°C daily swing.

    2024

Showing 1-8 of 12 case studies