Variable-rate spraying across 4,000 hectares

Hartwell Farms Australia · 2025

Broadacre spraying is usually a decision made per paddock. On 4,000 hectares that means the sprayer treats the healthy rows and the struggling ones with the same tank — and pays for both.

The problem

The agronomist could see which parts of a paddock were under stress, but only by walking them, and only for the paddocks near the road. By the time a problem was visible from the ute it had usually been visible to the crop for a fortnight.

The sprayer itself was not the constraint. It had section control and a rate controller. What it did not have was anything to tell it that the next fifty metres needed less.

What we shipped

A weekly multispectral flight over the whole property, converted into an application map the sprayer's controller can read.

  • Cadence — flown the week before the spray window, not the month before. A map that is three weeks old describes a crop that no longer exists.
  • Resolution — 4 cm per pixel, which is fine enough to separate a stressed row from a stressed paddock.
  • Handoff — the output is a shapefile the existing controller already understands. No new hardware in the cab.
  • Verification — three ground-truthed sites per flight, so the index is checked against a spade, not trusted on faith.

The first full season ran 4,000 hectares on eleven flights and no change to the sprayer beyond loading a different prescription.

The result

Chemical use is down 38% across the property, and the reduction is concentrated where it should be: the paddocks with uniform vigour got less, the patchy ones got the same as before.

Yield held. That is the number that matters — a saving that costs yield is not a saving, it is a deferred loss.

Working on something like this? Talk to an engineer

More case studies

All case studies
  1. A container terminal that turns 18 AGVs into one lane plan

    Mixed traffic between manual trucks and an autonomous fleet, on a quay that never stops — 4.2 million TEU a year without a single vehicle-to-crane handover error.

    2026
  2. Night picking stopped being the bottleneck

    Twelve AMRs retrofitted around existing racking, with zero days of downtime during the changeover.

    2026
  3. Fourteen substations inspected, no outage booked

    A LiDAR payload that maps live switchgear from outside the exclusion zone, flown between scheduled maintenance windows.

    2025